02Preparation · cooking · utilities
The kitchen is a working system, not just a trailer.
Each kitchen includes a stove, oven, and essential cooking utensils. Additional equipment options are available through 24/7 support.
Cooking & preparation
Each kitchen includes a stove, oven and essential cooking utensils. Review the menu and meal volume with the team before choosing additional cooking equipment.
Plan preparation space around how ingredients, staff and finished meals will move through the temporary kitchen. Confirm the approved work surfaces, equipment and access items for the selected configuration.
Sanitation & dishwashing
Agree the cleaning, handwashing and waste arrangements before service begins. The sanitation plan covers checks before delivery, after return and during off-rent maintenance; the project quote should make on-site responsibilities clear.
Final sanitation, inspection, and maintenance records for restaurant continuity during phased renovation should be verified through company operations before delivery and before the next rental assignment.
Utilities & site access
Review electrical capacity, potable water, wastewater, fuel, ventilation clearances and required approvals with the selected equipment.
Refrigeration & storage
The catalog lists the configurations below. Refrigeration prices and billing periods are not verified for publication; ask for a separate written quote covering the unit, rental term, transport and setup.
Review dry and cold storage separately from cooking capacity. Confirm the volume, temperature requirements and access needed for the menu and delivery schedule.
powerFor restaurant continuity during phased renovation, verify the approved power source, capacity, connection type, and connection location for the selected trailer configuration.
water supplyFor phased kitchen renovation and section-by-section remodel, verify a potable water source, required pressure or flow, hose connection, and availability at the placement area.
wastewaterFor a restaurant continuity during phased renovation deployment, verify the gray-water drainage, holding-tank, pump, or disposal method required for the selected configuration and site.
fuelFor the equipment package selected for restaurants and hotels and phased kitchen renovation and section-by-section remodel, verify propane, natural gas, or other approved fuel requirements where applicable.
ventilationBefore supporting phased kitchen renovation and section-by-section remodel, verify ventilation, exhaust, clearance, and placement requirements for the trailer and selected equipment.
site accessFor a restaurant continuity during phased renovation site, verify a suitable placement area, delivery access, clearances, level conditions, stairs, ramps, and other access needs.
approvalsFor restaurant continuity during phased renovation, verify permits, inspections, local code requirements, and utility coordination before delivery where applicable.
pre delivery checkBefore dispatch for phased kitchen renovation and section-by-section remodel, verify that required connections, access, approvals, and site preparations are ready.